September 21, 2017
Work is progressing on a second bridge crossing the Fairfield Canal. The span will connect the campus expansion to the existing campus on the western edge of Science and Engineering 1 and 2.
Work is progressing on a second bridge crossing the Fairfield Canal. The span will connect the campus expansion to the existing campus on the western edge of Science and Engineering 1 and 2.